Search
Close this search box.

Blyth Battery Goes Live. NHOA Energy and Elecnor Commission the 477MWh Asset for Neoen in South Australia

Blyth, 10 April 2025 — NHOA Energy, a global leader in the design, delivery and servicing of utility-scale energy storage systems, announces the completion of construction and commissioning of Neoen’s 238.5 MW / 477 MWh Blyth Battery. The project was delivered for Neoen and in partnership with Elecnor Australia. Completion … [continued]

The post Blyth Battery Goes Live. NHOA Energy and Elecnor Commission the 477MWh Asset for Neoen in South Australia appeared first on CleanTechnica.

Share this post:

Leave a Reply

Your email address will not be published. Required fields are marked *

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore