Search
Close this search box.

SouthCoast Wind 1 gains approval for onshore transmission facilities

The facilities will be located at the retired coal-fired Brayton Point Power Station, where the project will connect to the grid.

Share this post:

Leave a Reply

Your email address will not be published. Required fields are marked *

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore