Search
Close this search box.

The cheese stands alone: Green Bay approves its first utility-scale battery energy storage system

The City of Green Bay has authorized land to be used for a proposed 200-megawatt, 800-megawatt-hour battery energy storage system.

Share this post:

Leave a Reply

Your email address will not be published. Required fields are marked *

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore